A NetBackup master server has commenced writing four long-running duplication jobs to an AdvancedDisk
disk pool. The value of "Maximum concurrent jobs" for the storage unit and "Limit I/O streams" for the disk
pool are both set to 4.
There are 35 jobs queued on the master server that require this disk pool:
5 replication jobs with priority 9999
10 backup jobs with priority 999
20 duplication jobs with priority 99
Two restore jobs that require this disk pool are then submitted with default priority.
Which job type goes active next?
An administrator configures a default Standard file system backup policy, which backs up very large file
systems from a set of clients. There are multiple scheduled backup attempts configured.
How can the administrator reduce the amount of time needed to complete these backup jobs after failures?