A homeowner is weighing the PV module options for a roof-mounted solar array. Which is a correct option to
present to the homeowner?
A project is using a PV module with a 25-38dc maximum power voltage range and a single input inverter with
an operating windows of 250vdc-450dc. The dwelling the system is to be installed on has a 5:12 roof with a
southeastem face that can accommodate 14 modules and southwestern face that can accommodate 10 modules.
What is the MAXIMUM number of modules that can be installed for proper inverter maximum power point
tracking?
The following dc portion of a PV schematic (functionally grounded conductor not shown) is submitted to the building official for permit approval. The building official, who also is he AHJ, allow the system to be installed by requiring what NEC-required MINIMUM size equipment grounding conductor at Location A?
A PV system installation utilizes micro inverters connected to each module of the array. Each micro inverter
has a nominal rated output of 250WV. Single phase. The microinverters are listed so that multiple inverters
may be connected in parallel to a single feeder circuit, and each inverter has ancable and connector rated for
30A. What is the MAXIMUM number of inverters that may be wired together on a single 30A feeder circuit?
Which of the following is an NEC requirement regarding access for large-scale PV electric power production
facilities?