Choose the correct answer
For a system with stringent real-time requirements and power-consumption constraints, which concern would
lead the designer to employ the MARTE profile?
Choose the correct answer
Which option is a measure of model quality?
Choose the correct answer.
An engineering learn has been charged to design and build an embedded real-time control system using COTS
(Commercial Off-The-Shelf) purchased components where possible A technical risk for such a control system
is that the system will miss (i.e . fail to respond to) critical inputs The project has the additional risk that there
may not be any components on the market that will meet both timing and cost constraints
Given this, what information must be in the model before the engineering team can begin selecting and
procuring COTS components?
Choose the correct answer-.
Which technique allows a user to objectively determine the best means of implementing a particular (unction?
Choose the coned answer
What is one of the best reasons for a modeling Systems Engineer to use OCL?