×

Special Offer! Sale of the Month | Extra 20% Off - Ends In Coupon code: DG2020

Free PECB ISO-45001-Lead-Auditor Exam Questions

Absolute Free ISO-45001-Lead-Auditor Exam Practice for Comprehensive Preparation 

  • PECB ISO-45001-Lead-Auditor Exam Questions
  • Provided By: PECB
  • Exam: PECB Certified ISO 45001 Lead Auditor
  • Certification: PECB Auditor
  • Total Questions: 43
  • Updated On: Jan 27, 2025
  • Rated: 4.9 |
  • Online Users: 86
Page No. 1 of 9
Add To Cart
  • Question 1
    • On behalf of a certification body, you are conducting a combined audit of Shelf-Fit. The organization designs, manufacturing install interiors for retail stores. They employ subcontractors for the installation work. Representing the ISO 45001 audit, you ask the Purchase Manager about the identification of health and safety hazards for contractors on site. Having previously reviewed the hazards list (HZD-21 Rev.3), you found that various health and safety hazards were listed but not were associated with contractor working on-site. When you ask about the use of contractors, the response is, ˜We know that contractors use chemicals, such as glues, paints and vanishes. We trust them since they know more than we do about the safe handling of such issues. The auditor made the same enquiry to an accompanying member of the health and safety team and was told that chemical safety had never been a problem with the installation process. Select three options to determine which findings stated are major nonconformities. 6.1.2.2) contractors.(clause 8.1.4.2) hazard List does not reference this. (Clause 6.1.2.2) H. The internal audit programme does not include installation sites. The audit programme does not cover the full OHS management system (Clause 9.2.2) I. The purchase manager confirmed that the safe use of chemicals in installation work was left to the contractor

      Answer: A
  • Question 2
    • Which two of the following are examples of activities that may occur after the third-party audit has been closed by the individual(s) managing the audit programme?

      Answer: A,C
  • Question 3
    • Which two of the following are examples of activities that may occur after the third-party audit has been closed by the individual(s) managing the audit programme?

      Answer: A,C
  • Question 4
    • Showitoff is an organization specialization in the design and production of wall decorating materials for the domestic market. During an ISO 45001 certification audit of the site, the auditor comes across an open, walled area just outside the maintenance department. It contains various scraps of wood and metal as well as serveral rusty components. Several heavy concrete beams are learning against a thin brick wall in which cracks are available. When asked about it, the OHS Manager states that he presumes that the materials come from maintenance work, so it is the Maintenance Managers responsibility. The auditor interview the Maintenance Manager in his department. He asks about the area outside and is told that it contains some excess material that the Manager likes to keep in case they come in handy at some stage. The auditor points out that the wall appears to be unstable and could collapse at any moment. The Maintenance Manager is not aware of such a situation. The auditor decides to review the process for evaluation of compliance with health and safety regulations in more depth. Select six option that provide a meaningful audit trail for this process.

      Answer: B,C,E,F,I,J
  • Question 5
    • You are an audit team leader overseeing the activity of a trainee auditor. Your team has just completed a surveillance audit and is assembling the final report. The trainee has not contributed to a final report before and is clearly struggling with what she should provide to you for inclusion. Which three of her following statements would be appropriate?

      Answer: A,C,E,H
PAGE: 1 - 9
Add To Cart

© Copyrights DumpsEngine 2025. All Rights Reserved

We use cookies to ensure your best experience. So we hope you are happy to receive all cookies on the DumpsEngine.