Free Cisco 300-630 Exam Questions

Absolute Free 300-630 Exam Practice for Comprehensive Preparation 

  • Cisco 300-630 Exam Questions
  • Provided By: Cisco
  • Exam: Implementing Cisco Application Centric Infrastructure - Advanced
  • Certification: Cisco Certified Specialist
  • Total Questions: 122
  • Updated On: Nov 12, 2024
  • Rated: 4.9 |
  • Online Users: 244
Page No. 1 of 25
Add To Cart
  • Question 1
    • A Cisco ACI fabric is connected to a switched network that runs Spanning Tree Protocol on VLAN 101. VLANs 101, 102, and 103 are mapped to bridge domain BD10123.

      The leaf node that is attached to this switched network receives a spanning-tree topology change notification. Which endpoints does ACI flush?


      Answer: C
  • Question 2
    • 300-630-page49-image21
      Refer to the exhibit. An engineer must have communication between EPG1 in VRF1 and External EPG in
      VRF2. Which three actions should be taken for the defined subnets in the L3Out External EPG to accomplish
      this goal? (Choose three.)

      Answer: A,C,D
  • Question 3
    • 300-630-page49-image17
      Refer to the exhibit. Which two configurations enable inter-VRF communication? (Choose two.)

      Answer: A,B
  • Question 4
    • In a Cisco ACI Multi-Site fabric, the Inter-Site BUM Traffic Allow option is enabled in a specific stretched bridge
      domain. What is used to forward BUM traffic to all endpoints in the same broadcast domain?

      Answer: D
  • Question 5
    • What is the purpose of enabling ARP flooding when VMs are migrated from a pre-existing network to Cisco ACI and their gateways remain configured in the legacy setup?

      Answer: A
PAGE: 1 - 25
Add To Cart

© Copyrights DumpsEngine 2024. All Rights Reserved

We use cookies to ensure your best experience. So we hope you are happy to receive all cookies on the DumpsEngine.